Answer: The Customer Maintenance Notice is a document that should be explained to the customer on-site, immediately after dvLED installation (during or after software setup). The document contains crucial information regarding proper usage and maintenance critical to effectively extending the life cycle of the product. Note: Full documen...
Power Receptacle Type L5-30P, EU, UK, AU, CN (may vary depending on region. double check power supply compatibility) Power Input Voltage Range 100-240 V ~ 50/60Hz Input Current 30A max @110V; 15A max@220V Leakage Current <0.25mA@240VAC Power Outlet quantity 1 (for 108", 135", 163"), 2 (for 216") *Recommended use on a singl...
The Bracket installation order varies from the Floor Stand configuration. Please follow the steps in the respective order for the Wall-mount configuration: Appropriate location and center point found for installation (e.g. upper bracket mounted at least two meters above the ground for a 135" LED display; for other display sizes, check corresp...
Answer: There may be damage to the LED module's circuitry. Please check for unlit LEDs and refer to the LED Acceptance Criteria to replace appropriately. Related link: "Do I have to wear the anti-static gloves when installing LED modules for the DVLED Display?"
Answer: The Vacuum Suction Tool is used for removing LED Modules (or LED tiles) from the DVLED Display. See "How do I remove LED Modules from the dvLED Display?" for more information on how to use the Vacuum Suction Tool.
Solution Step 1: Please contact customer service staff to obtain the mandatory firmware update file(s) Step 2: Copy the files to the outermost directory of the USB Step 3: Turn off the power of the LED display and plug in the USB Step 4: Press the power button to turn on the display, and immediately press the Menu butto...
The Transfer Board (also known as a Transfer Card) is an internal component that facilitates signal connections between LED modules and the cabinet. Note: Current models have largely transitioned to "3-in-1 Boards." This article is for legacy product maintenance and technical reference only. Key Functions: Signal Supplementing: Routes ...
The Dehumidification service (or Dehumidification process) can be used to protect the LED module(s) by displaying a dark screen and gradually transitioning to a lighter screen. The concept is to gradually remove humidity by slowly heating up the circuitry - since a lighter colored screen uses more power than a darker colored screen. The total p...
To ensure a seamless installation, a comprehensive assessment of the mounting location, structural integrity, power supply, and site logistics is mandatory. Steps and Checklist: Installation Environment Define the exact mounting location and ensure there is ample room for equipment (e.g., tools, ladders, scaffolding). Power and C...
Proper tools are essential for precise alignment and preventing electronic damage. The list includes measurement instruments, power tools, and mandatory ESD protection. Steps: Prepare tools according to the following categories: Measurement & Alignment Self-leveling laser level. Stud sensor/finder (multi-depth/material). 4-vial...